ALTERNATING CURRENT MACHINES – I(Practical:)
Completion requirements
1
5. Perform parallel operation of two single phase transformers.
6.1 Draw the circuit diagram.
6.2 Collect tools, equipment & materials required.
6.3 Connect the equipment according to the circuit diagram with proper polarity.
6.4 Energize the circuit and connect the load to the secondary.
6.5 Record the energy shared by each transformer.